Sunday, April 23, 2017

Week 3/29 to 4/5

This is the week before the Paseo Public Prototyping Challenge. The team was informed that the track was completed. The team started to attach the corrugated metal strip on the tack. The adhesive we use to attach corrugated strip on the track is super glue. The team had tried hot glue, Epoxy and High-Strength spray adhesive. None of these adhesives work with our design. Thus, the team decided to use super glue instead. The corrugated metal strips were attached on the track. There was another new problem found. The corrugated metal strips have to leave space for the screws for assemble and dissemble the track, there no quick solution for the problem right now.


The mobile application team informed us that the communication system between the podcars was not ready yet, thus, the position sensing system will not be ready for the Paseo event.

No comments:

Post a Comment